When applying epoxy, use a throwaway chip brush and container. |
Why not seal the end grain of sanded (or new) bottom rails while you are mixing some epoxy? It's a good idea because any end grain can wick moisture. It's a little added protection against future rot.
System Three SculpWood is a much better repair material than any box store wood fillers. |
It's possible that there will be some holes in the rail bottoms, either from nails or from rot. Make sure the railing pieces are dry to the touch, then scrape out any soft, crumbly wood. It is suggested that you coat all holes with liquid Rot Fix before
filling them with System Three's putty, SculpWood. You can add the putty
immediately after application of the liquid epoxy. SculpWood's mixture ratio is a simple 1:1. Simply scoop the putty resin from one container and the same amount of hardener putty from the other, mix them well and use a flat tool to spread the mixture.
Rot Fix epoxy putty is easy to manipulate and even easier to mix. |
This combination of epoxy liquid and putty, after proper curing, is extremely tough, grips wood with tenacity, can be sanded easily, and then be painted like any other wood. I couldn't repair my house in the woods without it! Use sandpaper sheets or bust out the Feintool and sanding pads to conquer this job quickly.
Make sure to pair up the right bottom rails and top boards. |
If you have taken down several sections of railings, its a good idea to match lengths up to ensure the rebuild goes smoothly. Because putty work and even paint can conceal the original spindle placement, you can use the screw holes in the 2x4 top boards to space spindles. Otherwise, you can measure railing that is still mounted to the porch and take that as the basis for spindle spacing.
When to paint is up to you -before or after assembly. After is probably best, although fussier. |
There are many nail guns out there, but I prefer 18gauge pneumatic guns. |
The compressor and gallon tank came as a kit with the brad gun. |
For this project, I use one 2 inch galvanized (reduces corrosion) brad to fasten the bottom rail to the spindles. This single brad is used to hold the spindles in place before sinking the more functional, angled brad. This second brad is driven from the side of the bottom rail, upwards into the spindle to give the piece a modicum of downward resistance. These accent rails are not intended to hold much weight, although that hasn't stopped many people from hanging plants or other objects from them!
That slight angle seen where the spindle meets the bottom rail (at top, its upside down!) will help keep railings dry. |
I haven't yet addressed how nails and screws can also lead to rot in porch railing systems. We often find some rot where brads pierce the bottom rails to attached spindles. As water accumulates on these rails where nails penetrate the the paint film, the water can travel the length of the nail, deep into the wood. Cold metal of nails or screws can also condense moisture out of the air, covering the metal with dew -inside the wood!
My solution is to angle the spindles to create a slope that reduces the accumulation of water. I add epoxy sealer to limit wicking of moisture deep into the wood. Finally, I prime and paint with a high quality, gloss paint to protect the wood from the destructive action of the sun and moisture.
I have paint preferences, but whatever you do, do not buy the lowest cost paint. |
Because I mentioned that it is possible to use the very same techniques on the handrail as the upper accent rail, it's useful to add a few more images of the the handrail as there are some minor differences.
As you can see here, there is a screw sticking up through the bottom rail of the handrail structure. This screw is used to fasten the spindles from below. This is the opposite of the top accent rail that was covered in the above article.
The spindles on the handrail will be fastened with screws to the bottom rail -yes, the one that requires draining, Some of those screws can be seen in the above picture of the underside of the handrails bottom rail. The reason for this is twofold. The first is that brad nails would not be strong enough to resist downward pressure from things like someone's foot resting on that lower rail. The other reason is more subtle -the underside of the bottom rail is not visible so brads are not needed to conceal the fastening system.
The top of the handrail -the most expensive component, is not screwed into the spindles at all. It is brad nailed from above, diagonally into the spindles. The bottom of the upper handrail is milled as a channel. This channel accepts 2x2 spindles perfectly. It also provides outward and inward resistance to movement. Two brads are sunk as described to lock it in place -but that is about all they do. As you can see, screws are fasteners used where they are not visible, brads where visible. Brads are never used where strength is mandatory -that is unless the pieces will be glued, an unlikely practice in outdoor woodwork.
No comments: